Quality approach
Define it clearly.
Check what matters.
Drawings define the parts; the assembly specification defines how they work together. Agree the checks and records before production.
Discuss quality needsPlan before production
Make acceptance
criteria explicit.
Our proposed quality plan is part-specific. Confirm the required scope and deliverables during quotation and order review.
Drawing & revision
Align part numbers, revisions, material, finish and assembly BOM. Identify critical-to-function features and interfaces.
Inspection checkpoints
Agree first-piece, outside-process and assembly checks. Where relevant, include fit, orientation and bonding conditions; confirm any functional test method and equipment separately.
Evidence to match the requirement
Specify inspection records, material certificates and batch traceability needs before the order.
Shipment handover
Agree packaging, part identification, accompanying documents and tracking information.
Inspection capabilities
Measurement with a purpose.
| Area | Capability | Discuss in your RFQ |
|---|---|---|
| Dimensional | Coordinate measurement and conventional dimensional checks | Datums, feature locations and drawing dimensions |
| Optical | Optical measurement and feature examination | Profiles, small features and visual requirements |
| Surface & form | Surface-roughness and roundness measurement | Finish and rotational form where specified |
| Material condition | Hardness measurement | Specified hardness requirements; material certificates agreed separately |
Dimensional
- Capability
- Coordinate measurement and conventional dimensional checks
- Discuss in your RFQ
- Datums, feature locations and drawing dimensions
Optical
- Capability
- Optical measurement and feature examination
- Discuss in your RFQ
- Profiles, small features and visual requirements
Surface & form
- Capability
- Surface-roughness and roundness measurement
- Discuss in your RFQ
- Finish and rotational form where specified
Material condition
- Capability
- Hardness measurement
- Discuss in your RFQ
- Specified hardness requirements; material certificates agreed separately
Methods and reporting scope are selected and agreed for each part.
Your next project
Let’s make
your next project.
A machined part, a component assembly or a checking fixture. Start with the drawing, bill of materials or intended use.
Discuss your projectDirect contact with your US point of contact.
Contact